Today we are going to clean up from our Concrete pours at the intersection of College and Main and Catherine and Main. We will be installing the Handicap Domes in the Crosswalk areas. On the [...]
Electrical conduit work continuing at intersection of North College and Main. We hope to cross North College today. On the South side we will be pouring sidewalk and flume at Catherine and Main [...]
As you can see, the excavation between College and Tugaloo on the North side of Main is massive. We are installing the conduit and pull boxes to move the overhead power to underground for the [...]
The North side of Main seems to be going faster than the South side did because of the fact that there is no new waterline to install. The time consuming factor will be the overhead electrical to [...]
Continuing Electrical Conduit on the North side of Main. Should move to the block from College to Tugaloo today. Tip island curb and sidewalk work on the South side of Main. We will need to close [...]
Electrical Conduit work today on the North Side of Main. Concrete work will include forming for the H/C Crosswalks on the South Side of Main. The volume of rain will delay starts until we can [...]
Demolition is complete between Catherine and Tugaloo. Some dress-up and cleanup will occur today. Electrical conduit will start Monday. We will be trying to return some parking on the North Side [...]
Demo almost complete between College and Tugaloo on the North side of Main. Work will seem slow while the Electrical work is done. Duke Power has some overhead to underground changeovers to do. [...]
If the weather allows we will be pouring the tip island at the intersection of Main and College. It will be a partial pour because we will be waiting on AT&T and Duke Power to do their work. [...]
Forming curb work at the intersection of College and Main. Also going to form at the intersection of Catherine and Main. Partial curb in this area because of the continuation of the waterline to [...]