Streetscape – August 7, 2015

More sidewalk pouring between Tugaloo and College. Preparing for more curb and gutter at College St intersection. Preparing for sidewalks and curb and gutter between College and Catherine. [...]

0

HELP WANTED – MAINTENANCE WORKER I- PUBLIC WORKS

THE CITY OF WALHALLA IS ACCEPTING APPLICATIONS FOR A MAINTENANCE WORKER I IN THE PUBLIC WORKS DEPARTMENT. MUST POSSESS A VALID SC DRIVER’S LICENSE. FREQUENTLY LIFTS AND/OR MOVES 25 UP TO 100 LBS. [...]

0

Streetscape – August 6, 2015

There was an uncontrollable delay in the pouring of sidewalk yesterday. We will be pouring early today between Tugaloo and College. We will be preparing for Friday’s pour on up the street. [...]

0

Streetscape – August 5, 2015

Finally, new sidewalks and driveways in front of Bantam Chef. Thank you Bantam Chef for your cooperation. Thanks to Martha’s, we were able to run conduit thru the side parking lot for [...]

0

Streetscape – August 4, 2015

We would like to thank you for your patience during yesterdays road closure. We were able to get 15 Electrical and Phone conduits across Main to the North side of the street. Concrete sidewalk [...]

0

Streetscape – August 3, 2015

We hope that you noticed a change in the work last week as reconstruction has started. Curb work will continue today on both blocks. Electrical work will continue. If everything goes well, we [...]

0

Streetscape – July 31, 2015

Tugaloo to College; As you noticed curb and gutter started yesterday. More today. College to Catherine: Curb work and Electrical work. We have experienced some problems with the grades on the [...]

0

Streetscape – July 30, 2015

Sorry Folks about the other E-Mails. There will not be a closing of the side parking lots at the corner of College and Main Monday and Tuesday. I will not close them until Main is open and [...]

0

Streetscape – July 29, 2015

Tugaloo to College: Cleaning up and grading, getting ready for curb and gutter and sidewalks. College to Catherine: Working on electrical Conduit and light pole bases. Hutch-n-Son Construction

0

Streetscape – July 28, 2015

Tugaloo to College: Light pole bases are ready to pour. College to Catherine: Excavation partially done for electrical conduits. Hopefully installed today. Electrical work is slower than water [...]