Yesterday, we were able to gain some new sidewalks, and prep the dirt for more curb and gutter. We tried to install stone on the dirt to rainproof as best possible to return to work after a rain event. Also, as you noticed we were able to get partial striping on the new asphalt between Tugaloo and Catherine. Striping will continue as soon as the pavement is dry.

Today we will be staking, and setting elevations for the new curb and gutter between Catherine and Ann Streets.

Again, I want to emphasize the importance of driving in the one lane provided. Both East and West Entrances to the 4 Block area have been striped to show that there is only one lane that passes thru Town. The extra looking lane is the back-out lane. Please do not drive in that lane.