Today we will be starting curb work in the islands in the center of the Main. Please be careful we will have concrete trucks, curb machine and a lot of workers working in the middle of the road. [...]
We will be continuing the island curb and gutter today. About 8:30 or when the traffic clears we will be closing Main from College to Tugaloo to remove the two large pines next to the gas [...]
Today we will be pouring island curb at the intersection of Tugaloo and Main on the North Side. We will continue forming for curb at College and Main. We are still waiting on Duke Power to change [...]
For those who are paying attention to the streets, you noticed the middle of the road changing. The traffic devices are in the shape of the future islands. We started demolition today and will [...]
Today you will notice that we will be placing traffic barrels in the middle of the road. This is for us to survey and position the future islands. Then we will be taking out the asphalt in the [...]
Today we are going to clean up from our Concrete pours at the intersection of College and Main and Catherine and Main. We will be installing the Handicap Domes in the Crosswalk areas. On the [...]
Electrical conduit work continuing at intersection of North College and Main. We hope to cross North College today. On the South side we will be pouring sidewalk and flume at Catherine and Main [...]
As you can see, the excavation between College and Tugaloo on the North side of Main is massive. We are installing the conduit and pull boxes to move the overhead power to underground for the [...]
The North side of Main seems to be going faster than the South side did because of the fact that there is no new waterline to install. The time consuming factor will be the overhead electrical to [...]
Continuing Electrical Conduit on the North side of Main. Should move to the block from College to Tugaloo today. Tip island curb and sidewalk work on the South side of Main. We will need to close [...]