As everybody witnessed the weather did not cooperate with us yesterday. We attempted to continue but were stopped. Today weather permitting, we will be working on the backfill of the […]
I think we survived the island curb pouring today. There will be more work in the islands, such as Hydrant installation and backfill. This work will happen after we pour […]
Today we will be starting curb work in the islands in the center of the Main. Please be careful we will have concrete trucks, curb machine and a lot of […]
We will be continuing the island curb and gutter today. About 8:30 or when the traffic clears we will be closing Main from College to Tugaloo to remove the two […]
Today we will be pouring island curb at the intersection of Tugaloo and Main on the North Side. We will continue forming for curb at College and Main. We are […]
For those who are paying attention to the streets, you noticed the middle of the road changing. The traffic devices are in the shape of the future islands. We started […]
Today you will notice that we will be placing traffic barrels in the middle of the road. This is for us to survey and position the future islands. Then we […]
Today we are going to clean up from our Concrete pours at the intersection of College and Main and Catherine and Main. We will be installing the Handicap Domes in […]
Electrical conduit work continuing at intersection of North College and Main. We hope to cross North College today. On the South side we will be pouring sidewalk and flume at […]
As you can see, the excavation between College and Tugaloo on the North side of Main is massive. We are installing the conduit and pull boxes to move the overhead […]